Справочник Пользователя для Empire Comfort Systems 21)L(N

Скачать
Страница из 28
Page 14
20101-0-0306
1.  Place fireplace in framing opening.
2.  Using the four (4) nailing flanges provided with the fireplace, 
attach two (2) flanges on each side. Attach flanges through 
prepunched holes. Additional hole locations will be used for 
different finishing material with thicknesses of 1/2”, 5/8” and 
3/4”. Attach these flanges with screws provided, two (2) per 
nailing flange.
3.  Nailing flanges should fit directly against framing material. 
Use at least one (1) nail per tab to secure in place.
Attention:  Add  3  3/4"  to  "A"  Dimensions  when  using  flush 
mantel base.
Figure 12
Fireplace framing can be built before or after the fireplace is set 
in place. Framing should be positioned to accommodate wall 
covering  and  fireplace  facing  material. The  fireplace  framing 
should be constructed of 2 x 4 lumber or heavier. 
Figure 11
Figure 10
VFP32FP
VFP36FP
"A"
36 1/4"
38 1/4"
"B"
34 1/2"
39 1/2"
"C"
17 7/8"
17 7/8"
NAIL OR OTHER SUITABLE FASTENER
FIREPLACE FRAMING AND INSTALLATION