Руководство По Установке для Zhone 5100

Скачать
Страница из 98
Standard 19-inch rack installation
Vpacket 5100/6100 Series Installer’s Guide
                                                                                                 
Figure 2-4. Attaching the mounting brackets to the 5100/6100 VDR for a flush position
2. 
Position the 5100/6100 VDR on the rack by lining up the integrated mounting ears with the 
holes in the rack and use your rack’s screws to secure the VDR to the rack.
3. Connect the appropriate cables. See Chapter 3 “Port connections” on page 19.
4. Attach the captive grounding nut to a protective earthing terminal which has a permanent 
connection to building earth.
5. To power on the 5100/6100 VDR unit, see “Connecting to a PC and powering the VDR” on 
page 29.
You have sucessfully installed the 5100/6100 VDR in a rack. 
To rack mount the VDR with a 3-inch forward offset
1. Use the supplied screws to attach the mounting brackets to the 5100/6100 VDR. See 
Caution. Use of longer screws could result in damage of internal components.
Figure 2-5. Attaching the mounting brackets to the 5100/6100 VDR for a forward offset mount
2. 
Position the 5100/6100 VDR on the rack by lining up the integrated mounting ears with the 
holes in the rack.
3.  Secure the 5100/6100 VDR to the rack.
4. Connect the appropriate network cables. See Chapter 3 “Port connections” on page 19.
5. Attach the captive grounding nut to a protective earthing terminal which has a permanent 
connection to building earth.
6. To power on the 5100/6100 VDR, see “Connecting to a PC and powering the VDR” on 
page 29.
You have successfully installed the 5100/6100 VDR in a rack. 
!