Использование И Уход для KitchenAid KXW9748YSS
7
INSTALLATION INSTRUCTIONS
Prepare Location
■
It is recommended that the vent system be installed
before range hood is installed.
■
Before making cutouts, make sure there is proper
clearance within the ceiling or wall for exhaust vent.
■
Range hood is to be installed 24" (61.0 cm) min. for
electric cooking surfaces, 30" (76.2 cm) min. for gas
cooking surfaces, to a suggested maximum of 36"
(91.4 cm) above the cooking surface.
■
Check your ceiling height and the range hood height
maximum before you select your range hood.
1. Disconnect power.
2. Determine which venting method to use: roof or wall.
3. Select a flat surface for assembling the range hood.
2. Determine which venting method to use: roof or wall.
3. Select a flat surface for assembling the range hood.
Place covering over that surface.
4. Using 2 or more people, lift range hood onto
covered surface.
Range Hood Mounting Screws Installation
1. Determine and mark the centerline on the wall where
the range hood will be installed.
2. Based on the ceiling or soffit height, determine the distance
“X” (24" [61.0 cm] min. from electric cooking surface or 30"
[76.2 cm] min. to gas cooking surface, suggested 36"
[91.4 cm] max.) needed between the cooking surface and
the bottom of the range hood. To this distance, add 17
1
/
8
"
(43.5 cm) and draw a horizontal line (A) about 24" (61.0 cm)
long centered on the vertical centerline (B) at this distance.
3. Following the illustrations in Step 4, mark points on
each side of the horizontal line as measured from the
vertical centerline.
4. Drill
3
/
32
" (2.4 mm) pilot holes for installation into wood.
The screws provided for mounting this range hood must
be fastened into solid wood. Do not fasten only into
sheet rock.
IMPORTANT: All screws must be installed into wood.
IMPORTANT: All screws must be installed into wood.
If there is no wood to screw into, additional wall framing
supports may be required.
5. Install the 5 x 45 mm mounting screws. Leave a
1
/
4
" (6.4 mm)
gap between the wall and the back of the screw head to
slide range hood into place.
Chimney Support Bracket Installation
1. Place two of the chimney brackets against the wall so that
their top edges are
1
/
16
" (2.0 mm) from the ceiling or soffit
and level. Mark holes.
2. Drill pilot holes.
■
If installing into wood, drill 4 -
3
/
32
" (2.4 mm) pilot holes.
3. Attach each bracket to the wall with a 4.2 x 8 mm mounting
screw. Tighten screws securely.
WARNING
Excessive Weight Hazard
Use two or more people to move and install
range hood.
Failure to do so can result in back or other injury.
Failure to do so can result in back or other injury.
A
B
C
D
A. Horizontal line
B. Vertical centerline
C. Cooking surface
D. Distance “X” (24" [61.0 cm] min.
B. Vertical centerline
C. Cooking surface
D. Distance “X” (24" [61.0 cm] min.
from electric cooking surface, 30"
[76.2 cm] min. from gas cooking
surface, suggested 36" [91.4 cm]
max.) +17
1
/
8
" (43.5 cm)
A
B
C
A. Horizontal line
B. Vertical centerline of range hood
C. 5
B. Vertical centerline of range hood
C. 5
11
/
16
" (14.4 cm)
¹⁄₄
"
(6.4 mm)
B
A
C
C
A. Vertical centerline
B.
B.
1
/
16
" (1.6 mm)
C. 10
9
/
16
" (26.9 cm)