Руководство По Установке для Cisco Cisco ONS 15216 DWDM System

Скачать
Страница из 26
11
Unpacking and Installing the Cisco ONS 15216 Three-Component Bay Assembly (15216-ILA-BAY)
78-16368-01
  Installation Instructions
You can use the base plate or extender base holes to route the fibers. Cisco recommends using the base 
plate holes for the bottom component or node and the extender base holes for the other components. All 
electrical cables will be routed in the back of the rack in the extender bases. Holes should already be cut 
out in the raised floor tile to compensate for any cables.
Step 3
Once all fiber cables have been placed in the front portion of the rack, replace the base plate by sliding 
it toward the back of the rack. 
 shows the routed fiber with the base plate replaced.
Figure 7
Raised Floor Extender Base Fiber Routing
99433