Руководство По Установке для Cisco Cisco ONS 15216 DWDM System

Скачать
Страница из 26
17
Unpacking and Installing the Cisco ONS 15216 Three-Component Bay Assembly (15216-ILA-BAY)
78-16368-01
  GMT Fuse and Alarm Panel
FAP Output and Input Power
Route and connect output and input power according to local site practice. 
 through 
 
show output and input lugs and wiring and 
 list lug wiring 
positions.
Note
CO power from the BDFB to the bay assembly must be a direct feed from a single breaker (one breaker 
for return, and one breaker for -48VDC) at the BDFB to the input connection of the bay assembly. The 
size or gauge of the power wire feed must be calculated by the distance from the BDFB to the FAP.
Figure 16
Connecting Output Power Using Ring-Type Compression Lugs
115018
PWR FAIL B
C.GND
C.GND
FUSE ALARM B
PWR FAIL A
FUSE ALARM A
BATT
B
RTN
BATT
A
RTN
BATT
RTN
1
2
3
4
5
6
7
8
9
10
BATT
RTN
1
2
3
4
5
6
7
8
9
10
NO C NC
NO C NC
NO C NC
NO C NC
Tighten terminal screws
to 15 Pound-force Inches
(1.7 Newton Meters) of torque
Power
return
terminals
Power
feed
terminals