Руководство По Установке для Cisco GainMaker Optoelectronic Node 1GHz with 55 70 MHz Split
Removing and Installing AC Shunt Power Directors
3 To insert a power director, refer to the systems design print to determine AC
power routing and install the AC shunt power directors in the required
locations.
Note: If supplying power to the node through the main input port, a power
Note: If supplying power to the node through the main input port, a power
inserter must be installed to terminate the RF signal.
4 Close the node housing. Refer to
To Close the Node Housing (on page 17).
OL-30035-03
39