Руководство По Установке для Cisco GainMaker Optoelectronic Node 1GHz with 55 70 MHz Split

Скачать
Страница из 182
 
Removing and Reinstalling the Optical Modules 
 
 
 
7  Pull the transmitter out from the optical section. 
a  If you are not reinstalling the transmitter at this time, proceed to step 11. 
b  If you are reinstalling the transmitter now, proceed to step 8. 
8  Insert the transmitter in the appropriate slot and ensure that the transmitter is 
seated properly. 
Note: Insertion slot is labeled on the optical interface board. 
9  Use a flat-blade screwdriver to tighten the two mounting screws. 
10  Route the fiber pigtail through the fiber access slot. 
Note: Route excess fiber loosely through the fiber hold-down clip.   
 
CAUTION: 
Be careful not to damage the fiber or pigtails. 
11  Reconnect the fiber connector to the fiber bulkhead adapter. 
12  Rotate the fiber management tray to its stored position. Refer to 
To Stow the 
Fiber Management Tray (on page 26). 
13  Insert the AC shunt power directors. 
Note: If supplying power to the node through the main input port, a power 
inserter must be installed to terminate the RF signal. 
14  Locate the proper fiber connector and connect to the fiber bulkhead adapter. 
15  Close the node housing. Refer to 
To Close the Node Housing (on page 17). 
 
 
OL-30035-03 
41