Руководство По Установке для Cisco Cisco Content Security Management Appliance M160

Скачать
Страница из 16
8
8  
Plug In and Power Up the 
Appliance
Plug in the appliance, then power up the appliance by pressing 
the On/Off switch on the front panel of the Cisco M690. You 
must wait 10 minutes for the system to initialize each time you 
power up the system. 
After the machine powers up, solid green lights on the front of 
the appliance indicate that the appliance is operational. The 
network activity light will be green but may not be solid. 
Caution
If turned on quickly after connecting power to the 
appliance, the appliance powers up, the fans spin 
and the LEDs turn on. Within 30-60 seconds, the 
fans stop and all LEDs turn off. The appliance 
powers on 31 seconds later. This behavior is by 
design to allow the system firmware and controller 
to synchronize. 
 
 
Wait at least 10 minutes for the system to complete 
the power up sequence and the LEDs to turn green. 
 
If you turn the power off before the initialization is 
complete, the appliance will NOT reach an 
operational state and must be returned to Cisco.
7
Data 5
A Gigabit Ethernet customer data 
interface.
8
Management 
interface
The Gigabit Ethernet interface that is 
restricted to management use only. 
Item
Port
Description
M690_QSG.fm  Page 8  Thursday, March 31, 2016  5:43 PM