Release Note для Cisco Cisco Administrative Workstation
Enterprise ICM Dedicated Forest/Domain Model
o
Admin UI: under Collaboration Server\Server Setup\Connections\Monitor – all services
will have an UP status
will have an UP status
o
Media Blender:
o
Admin UI: under Media Blender\Server\Startup Shutdown – media blender has been
running for <time>
running for <time>
o
Admin UI: under Media Blender\Services\Firewall Gateway\Monitor – all gateway stubs
will have a RUN status
will have a RUN status
Step 39.
Complete Staging Tests
With the full ICM system in the staging environment, you can test fault tolerance prior to shipping the
system to the production environment. Refer to the section in the document on
system to the production environment. Refer to the section in the document on
in the
Staging Environment.
Step 40.
Complete Settings for Production Environment
Validate the following settings from the system diagram for the Production Environment and make the
required changes prior to shipping systems. If you used “dummy” IP addresses during the staging process,
you need to load the actual Host Names/IP Addresses for the system onto the DNS Server (Logger/DNS
Server) and the actual/production IP addresses set:
required changes prior to shipping systems. If you used “dummy” IP addresses during the staging process,
you need to load the actual Host Names/IP Addresses for the system onto the DNS Server (Logger/DNS
Server) and the actual/production IP addresses set:
o
IPAddresses (visible and private, high and low)
o
Default Gateways
o
Masks
o
DNS preferred and alternate servers on visible cards
o
Static Routes
o
Active Directory WAN Sites and Subnets
o
DNS Forward and Reverse Lookup Zone Records
o
Label each Network Card and Port - Label the machine on the front and back with the host name
o
Create Emergency Repair Disk
o
Clear Event Logs
o
Clear any Dr. Watson Application Errors
o
Remove any diskettes, CD’s or media from drives
o
Make sure that all ICM Services are set to Manual Start – Services are not set to AUTOSTART until
after the implementation testing in the production environment.
after the implementation testing in the production environment.
Step 41.
Complete Staging Issues Record
Assure that the
has been filled out as and accurate record of the Staging
event. Test Detail and note the test cases you run as pass/fail/exceptions. Any outstanding action items
from the Staging event should be documented and shared with the team and project manager(s) associated
with this project
from the Staging event should be documented and shared with the team and project manager(s) associated
with this project
Release 6.0(0) Staging on Windows 2000
44
44