Справочник Пользователя для Pelco C1525M-B

Скачать
Страница из 30
 
A D D E N D U M
 
Addendum No.
 
C1531M
 
Date
 
  October 25, 2005 
 
Manuals Affected
 
C1525M-B
 
Manual Update Installation of Support Rails
 
The instructions provided in this section replace the steps listed on page 11 of the Installation/Operation manual for 
installing the VMX200 in a 19-inch equipment rack.
 
Connecting Analog Video to the VMX200-SYS-Q
 
The instructions provided in this section replace the steps listed on page 15 of the Installation/Operation manual for 
connecting analog video inputs to the VMX200-SYS-Q.
 
Installation of Support Rails
 
The following instructions replace the steps listed on page 11 of the Installation/Operation manual for installing the VMX200 in a 19-inch equipment rack.
Refer to Figure 1 for the following instructions.
1. Attach the rack ears to the front sides of the VMX200 with the 10-32 x 0.250-inch screws.
2. Attach the brackets to the sides of the equipment with the 8-32 x 0.250-inch screws.
3. Fasten the front and rear support rails together with the 8-32 x 0.375-inch screws with lock washers.
4. Attach the support rails to the equipment rack with the 10-32 x 0.375 inch screws.
5. Slide the brackets on the equipment onto the support rails.
6. Fasten the rack ears to the equipment rack with 
the 10-32 x 0.750-inch screws and washers.
(Continued on next page)
VMX200
(4) SCREWS,
10-32 X 0.750-INCH
PHILLIPS, PAN HEAD
WITH WASHERS
SLOTTED HOLES
TOWARDS FRONT
OF UNIT
TAPERED ENDS
TOWARDS REAR
OF UNIT
(6) SCREWS, 8-32 X 0.250-INCH
PAN HEAD (3 EACH SIDE)
BRACKET
(SIDE VIEW)
(4) SCREWS,
10-32 X 0.375-INCH
FLAT HEAD
(6) SCREWS,
8-32 X 0.375-INCH,
PAN HEAD WITH 
WASHERS
(8) SCREWS,
10-32 X 0.375-INCH, 
FLAT HEAD
SUPPORT RAILS
RACK
Figure 1.  Installation of Support Rails