Справочник Пользователя для Crestron iw clsi-c6 clsi-c6m
iLux
™
Lighting Systems
Installation Guide – DOC. 6413A
iLux
™
Lighting Systems: CLSI-C6 & CLSI-C6M
• 3
5. Connect each load wire to the corresponding
LOAD terminals on the unit, connect the power
line hot wire from the circuit breaker to the HOT
terminal on the unit, connect all neutral wires to
the NEUTRAL terminal on the unit, and connect
all ground wires to the (ground) terminal on
the unit.
line hot wire from the circuit breaker to the HOT
terminal on the unit, connect all neutral wires to
the NEUTRAL terminal on the unit, and connect
all ground wires to the (ground) terminal on
the unit.
6. If Cresnet cabling is part of the installation,
attach the supplied terminal block connector(s)
to the Cresnet cable(s) and plug into the
appropriate port(s) on the unit. Make certain that
there is a minimum 1/4-inch (0.6 cm) separation
to the Cresnet cable(s) and plug into the
appropriate port(s) on the unit. Make certain that
there is a minimum 1/4-inch (0.6 cm) separation
between the Class 2 Cresnet wiring and the Class
1 AC wiring.
1 AC wiring.
7. Carefully tuck all wires into the wallbox and
fasten the unit to the wallbox using the four
7/8-inch Phillips screws supplied.
7/8-inch Phillips screws supplied.
8. Reattach the control panel overlay to the front
panel by inserting the four tabs into the slots
provided, and install the hinged front cover
assembly by lining it up at the top and pressing
the bottom edge until it snaps into position.
provided, and install the hinged front cover
assembly by lining it up at the top and pressing
the bottom edge until it snaps into position.
Power up and Testing
The following illustration shows the front panel of the
unit and the controls used during installation.
unit and the controls used during installation.
Front Panel Controls and Indicators
^^
Scene 1
Scene 2
Scene 3
Scene 4
Scene 5
Scene 6
^^
Min
Sec
Lights
Shades
Save
Cancel
1
2
3
4
5
6
ON
OFF
LED
Bargraphs
Two-Digit
Display
Function
Buttons
Verify the basic installation and wiring connections as
follows:
1. Press
the
Lights button to enable manual light
control, and press the right side and the left side
of each of the function buttons to increase and
decrease the lighting level of those loads. Verify
that the intended loads and corresponding LED
bargraphs respond appropriately.
of each of the function buttons to increase and
decrease the lighting level of those loads. Verify
that the intended loads and corresponding LED
bargraphs respond appropriately.
2. Press
the
OFF button to turn off all loads. The
loads will ramp down to off while the two-digit
display counts down to off (blank). Two seconds
after all lights have turned off, the unit’s master
air-gap relay opens making it safe to service the
lighting installations.
display counts down to off (blank). Two seconds
after all lights have turned off, the unit’s master
air-gap relay opens making it safe to service the
lighting installations.
LOAD 3
LOAD 2
LOAD 1
HOT
NEUTRAL
Distribution
Panel
LOAD 4
LOAD 5
LOAD 6
10A or 13A
Circuit
Breaker
A/R