Справочник Пользователя для SRT Marine Systems plc 425-0002
Junction Box Accessory
Page 75
7 Junction Box Accessory
7.1 What’s in the Box
The items below are included in the junction box purchase. If any of these
items are missing, please contact your dealer.
items are missing, please contact your dealer.
Figure 31 Junction Box - What’s in the Box
7.2 Installation
The junction box should be mounted within 2m of the AIS transceiver, to en-
sure that the cable can be run without compromising its performance.
sure that the cable can be run without compromising its performance.
1. Connect the two extension cables between the transceiver and the
junction box.
2. Remove the lid of the junction box using a 3mm Allen Key. Route your
accessory cables through the waterproof cable glands and find the
appropriate terminal blocks to fix them to.
appropriate terminal blocks to fix them to.
3. Use the connector diagrams shown in Figure 12 and Figure 14 as your
guide.
4. Secure the earth/screen/shield of the accessory cables to the metallic
strips of the junction box or to the appropriate connection on the termi-
nal block.
nal block.
5. By default, the 120 Ohm jumper connectors should all be fitted to termi-
nate any unused ports. If a port requires no termination, then that port’s
jumper can be removed.
jumper can be removed.
6. Secure the accessory cables within the junction box with cable ties.
7. Refit the lid securely to ensure waterproofing.
Quick Start
Guide
18 way
extension cable
14 way
extension cable
Junction
Box
Self-Tapping Screws