Справочник Пользователя для ZTE Corporation BS8800C200

Скачать
Страница из 167
Chapter 8 Installing Main Antenna Feeder System
F
IGURE
130 PVC A
DHESIVE
T
APE
Steps
1. Clean out dust and stain on the feeder connector or feeder
grounding clip.
2. Expand the waterproof insulation adhesive tape and strip off
release paper. The adhesive tape sticks to the connector or
the feeder which is 20–50 mm away from the lower end of
grounding clip .
3. Extend the adhesive tape to up to 1/2 – 3/4 of the former
width, in order to keep a certain extension strength. Bind the
feeder in an overlapping way from lower to upper and the up-
per adhesive tape covers a half of the lower adhesive tape, as
shown in
.
F
IGURE
131 W
ATERPROOF
I
NSULATION
A
DHESIVE
T
APE
W
RAP
Confidential and Proprietary Information of ZTE CORPORATION
141