R20 1X UBS Macro BTS Hardware Installation
Site verication
Site verication
Site installation checks
Verify that the site is ready for BTS installation before performing the physical installation.
A detailed layout of the site is provided with the site-specific documentation. Before installing
the hardware, compare the information presented here to the site-specific documentation layout
and verify with the Site Manager for the following:
All cable trays are installed.
All external signal cables are connected.
Site is clean.
Site specific documentation covering all site dependent installation information is available.
The installation area has restricted access. Equipment is meant to be installed and
operated in a restricted access location. In order to maintain UL listing, equipment must
be installed in a restricted access area.
The site can maintain the required temperature range.
The layout meets the minimum clearance requirements for the equipment as listed in
Table 2-5
,
Table 2-6
and
Table 2-7
.
All building DC power cables are connected.
The building meets the voltage and power requirements shown in
Site description (as
built)
documents.
Power cables are present that meet the requirements shown in
Table 2-8
.
The procedure, tools, and equipment required to mount the rack to the floor are specified
by a Structural Engineer.
The site can meet the footprint dimensions (as shown in
Figure 2-5
) and not violate any of
the required clearances.
Site grounding is according to Grounding Guidelines for Cellular Radio Installations
(Motorola part number 68P81150E62).
The screen (outer shield) of the RF antenna coaxial cable must be connected to earth
(grounded) at the entrance to the building. This should be done in accordance with
applicable national electrical installation codes (Section 820.93 of the National Electrical
Code, ANSI/NFPA 70.
Verify that the Master Ground Bar is connected to a solid earth ground. This is required
to ensure protection from hazardous voltages by providing a high integrity protective
earthing circuit when the frame is later grounded to the Master Ground Bar.