Справочник Пользователя для 3Com Corporation SRWL-306
2222
IIII
NSTALLING
THE
A
A
A
A
CCESS
PPPP
OINT
Before You Begin
The following items are required for installation:
■
3Com Integrated Power-over-Ethernet power supply and power cord.
■
Standard category 5 straight (8-wire) Ethernet cable for connecting the access
point to the power supply. This length of cable must reach from the access
point to the power supply.
If you plan to connect the access point to a wired network, you will need an
If you plan to connect the access point to a wired network, you will need an
additional length of Ethernet cable.
■
If you plan to mount the access point on a wall:
■
Mounting template
■
Wall mount hardware kit
■
If you plan to mount the access point to the T-rail grid of an acoustical ceiling:
■
Mounting bracket
■
Two #6 panhead screws
After hardware installation is complete:
■
Install the access point tools, utilities, and user guide from the installation CD.
■
Review the default system settings and ensure they are suitable for your site.
■
If required, use the administrative utilities to change configuration parameters.
See Using the Configuration Management System on page21.
For the latest networking information, see the 3Com Corporation World Wide
Web at:
http://www.3com.com/
For advanced installations, we recommend that you conduct a site survey before
permanently installing the access point. A site survey tool is provided on the
3Com Administrator Utilities CD. To conduct the survey, you must also use the
administrator utilities to set up a wireless client. See Conducting a Site Survey
CAUTION: Only professional network personnel should install the access point,
cables, and antennas.