3Com Corporation SRWL-306 用户手册

下载
页码 52
2222
IIII
NSTALLING
    
THE
    A
A
A
A
CCESS
    PPPP
OINT
Before You Begin
The following items are required for installation:
3Com Integrated Power-over-Ethernet power supply and power cord.
Standard category 5 straight (8-wire) Ethernet cable for connecting the access
point to the power supply. This length of cable must reach from the access
point to the power supply.
If you plan to connect the access point to a wired network, you will need an
additional length of Ethernet cable.
If you plan to mount the access point on a wall:
Mounting template
Wall mount hardware kit
If you plan to mount the access point to the T-rail grid of an acoustical ceiling:
Mounting bracket
Two #6 panhead screws
After hardware installation is complete:
Install the access point tools, utilities, and user guide from the installation CD.
Review the default system settings and ensure they are suitable for your site.
If required, use the administrative utilities to change configuration parameters.
See “Using the Configuration Management System” on page21.
For the latest networking information, see the 3Com Corporation World Wide
Web at:
http://www.3com.com/
For advanced installations, we recommend that you conduct a site survey before
permanently installing the access point. A site survey tool is provided on the
3Com Administrator Utilities CD. To conduct the survey, you must also use the
administrator utilities to set up a wireless client. See “Conducting a Site Survey”
CAUTION: Only professional network personnel should install the access point,
cables, and antennas.