Справочник Пользователя для Andrew Wireless Innovations Group RPT-NODEC1943

Скачать
Страница из 102
3 Installation 
 
ID No: 161692 
PRELIMINARY 
Page 15
 
 
Note:  Ensure that there is free access to the electrical connections as well 
as to the cabinet. The approved bending radius of the connected 
cables must not be exceeded. 
 
•  Drill eight holes (four per unit) at the marked positions and insert dowels*. 
 
*   The dowels are not part of the delivery (and thus not illustrated in the figure) since the suitable type 
depends on the on-site conditions (the material of wall). Therefore, use dowels that are appropriate 
for the mounting surface. 
 
•  Use a cap nut or locknut to screw the eight M8 dowel screws into the dowels. 
 
•  Use a hex wrench, opening 17 (old standard) or 16 (new standard), to loosen the 
M10 hexagon head screws (four per unit) by which the mounting brackets are 
fastened to the cabinet sides. 
 
•  Mount the mounting brackets to the screws, and fasten them using the M8 
washers, locking rings, and hex nuts that are part of the wall mounting kit. 
 
•  Hang the cabinets into the brackets and fasten them with the M10 hexagon head 
screws*. 
 
 
 
 
figure 3-2 Wall mounting procedure 
* If other screws than the ones delivered by the supplier are used for fastening, these must have a 
diameter of at least 8 mm and an appropriate length (depending on the dowels). Additionally, make 
sure they are adequate for supporting a maximum weight of 50 kg per unit.  
 
For mounting both cabinets as one unit, a cabinet combining kit is available. The 
according mounting procedure is explained in the following chapter. 
M10 hexagon head screws
G0987Z0
Locking ring M8 
Plain washer M8 
Dowel 
screw 
M8
Hex 
nut 
M8