Справочное Руководство для HP Performance Optimized Data Center (POD) 20cp
Site requirements 15
These actions must be performed for all associated parts of the electrical power train. The majority of the
details and factors required to complete these studies are associated with the existing installed facility
infrastructure.
infrastructure.
CAUTION:
Failure to complete these studies can cause serious issues with the electrical
integration of the POD into your electrical system.
Electrical power system configuration
A preliminary meeting with the HP POD Electrical Engineering team is necessary to discuss your decision
concerning capacity limitations and the impacts of this decision on the electrical design.
A 1N electrical configuration can be achieved by providing all of the required electrical feeders from a
A 1N electrical configuration can be achieved by providing all of the required electrical feeders from a
common power source, common switchboards, and transformers.
A 2N electrical configuration can be achieved by feeding parallel power paths from independent power
A 2N electrical configuration can be achieved by feeding parallel power paths from independent power
sources, switchboards, and transformers.