Справочник Пользователя для Sapphire Audio DV425TR

Скачать
Страница из 60
DV425TR DIRECT VENT ROOM HEATER
02/01                                                                                     Page 35                                                                               250-5533
Step 7. 
 
Continue to assemble pipe sections until 
the height of the vent cap (H) (Figure 15) meets 
the minimum code requirements as outlined in 
the current CAN/CGA-B149 Installation Codes (in 
Canada), the National Fuel Gas Code NFPA 54/ANSI 
Z223.1 (in USA), or local codes. Note that for steep 
roof pitches, the vent height must be increased.  
See Table 1 below. In high wind conditions, nearby 
trees adjoining rooflines, steep pitched roofs, and 
other similar factors can result in poor draft, or down 
drafting. In these cases increasing the vent height 
may solve this problem.
VERTICAL INSTALLATION, cont.
Fig. 15
Dimension "H"
Obtained From 
Table 1
TABLE 1
                                    MINIMUM HEIGHT
 ROOF PITCH 
  FEET   METERS
 Flat to 7/12 
0.30
 Over 7/12 to 8/12 
1.5 
0.46
 Over 8/12 to 9/12  
0.61
 Over 9/12 to 10/12 
2.5 
0.76
 Over 10/12 to 11/12  3.25 
0.99
Over 12/12 to 14/12  5 
1.52
Over 14/12 to 16/12  6 
1.83
Over 16/12 to 18/12  7 
2.13
Over 18/12 to 20/12  7.5 
2.29
Over 20/12 to 21/12  8 
2.44
The height of the vent cap must meet the 
minimum  building  code  requirements 
described above.
H