Руководство По Работе для Panasonic Attune II

Скачать
Страница из 48
19
Example of installation using the provided Foam 1 and 2
Mount the unit onto Foam 1, and install them into the order post.
1. 
When installing the unit and Foam 1, make sure that the entire 
• 
sound apertures of the 
Speaker Microphone can be set in the opening of the order post. If Foam 1 is larger than the 
order post, cut the exterior with a cutter or knife to set the form into the order post.
Push the rear side of the unit toward the front panel of the order post with the provided Foam 
2. 
2.
Push the rear side of the speaker with Foam 2 so that the front side of the main unit can be 
• 
stuck with the mounting surface of the order post without gap. If Foam 2 is larger than the 
order post, cut the exterior to set the form into the order post. Pass the cable through the 
space between Foam 1 and Foam 2.
Foam 1, Foam 2, the gaskets and the wind screen used for the installation may deteriorate 
• 
depending on the operating environment. Replace them with new ones regularly. For 
replacement, contact your dealer.
MAX 12mm
Foam 1
Foam 2
Cable
Push the unit with Foam 2 
from behind.
Front panel of the order post
MAX 12mm
This unit
Foam 1
Order post
Opening