Справочник Пользователя для Iveco S30 ENT M23

Скачать
Страница из 54
installation directiVe
0
MAY 2006
S30 ENT M23 
11. SECONDARY ANALOG INSTRUMENT PANEL
electronic
RPMx100
04_240_N
1
3
2
5
4
6
7
1.Connector for secondary panel wire harness (JH) - 2. Engine start push-button (CS) - 3. Revolution counter (CG) - 
4. Buzzer (SA) - 5. Indications and alarms module (MS) - 6. Engine stop push-button (AS) -  
7. Sound alarm inhibition push-button (P1).
Figure 
The connection is achieved by removing the cap on the JE 
connector of the main panel, and connecting the JE connec-
tor to the JH connector on the secondary panel, interposing 
the extension wire harness, available in 3, 5 and 7 meter-long 
versions (see Figure 29). The JE-JH wire harness comprises 
12 lines, each connected to the terminal identified on both 
connectors by the same number (see Figure 34).
CONNECTORS OF THE JE-JH EXTENSION WIRE 
HARNESS, SEEN FROM THE COUPLING SIDE 
Installation
In order to drill holes on the area where the panel is to be 
mounted, refer to the dimensions indicated in Chapter 12.
Operation of the secondary panel
After completing the electrical connection to the main panel 
and  engine  preparation,  and  performing  the  tests  required 
for  the  first  start  (as  described  in  Chapter  17),  verify  the 
proper operation of the panel, proceeding as follows:
o
  Make sure that the “ENGINE ROOM / BRIDGE” switch 
of the Relay Box is in the “BRIDGE” position, then turn 
the  key  switch  to  the  first  position,  thus  enabling  the 
operation of both panels.
o
  Carry  out  the  same  tests  for  the  secondary  panel  as 
were carried out for the main panel.
o
  Disable the secondary panel by bringing the key switch 
on the main panel to the resting or zero position.
Testing the engine start and stop function.
With  the  panel  enabled,  press  the  green  push-button  until 
the engine starts, then release it; wait for engine rpm to sta-
bilize before stopping it by pressing the red push-button.
The starting and stopping operations can be performed sev-
eral times and consecutively from the secondary panel
Checking indications
Proceed in the same way as for the main panel.
Figure 4
*%
*(
1
6
6
1
7
12
12
7
04_251_N