Справочник Пользователя для HP Performance Optimized Data Center (POD) 40c

Скачать
Страница из 84
 
Power up procedure  66 
Power up procedure 
Standard HP POD 40c G2 power up procedure 
This procedure is for your reference only and assumes that the POD was fully commissioned and powered up 
by HP before being turned over to you. 
Before beginning the power up procedures in this section, verify that the POD is not in operation and that the 
internal ambient temperature of the POD is greater than 10ºC (50ºF). If the internal ambient temperature of 
the POD is less than 10ºC (50ºF), see "Cold weather HP POD 40c G2 power up procedure (on page 
)." 
This process ensures personnel safety during the electrical start up of the HP POD 40c G2. 
  
 
WARNING:
  To avoid risk of personal injury or loss of life, do not open an energized POD 
electrical cabinet without an energized work permit and appropriate PPE. 
  
 
Standard power up checklist 
Site electrical 
Verify that all POD site power feeder breakers are open. 
POD electrical 
 
Hot aisle 
Verify that all IT power drop box breakers located on the power tap boxes are open. 
 
Cold aisle 
a. 
Close all breakers and fuses within the control cabinet. 
b. 
Close and latch the ECS cabinet with the supplied T-handle. 
c. 
Position the EPO system to Armed (White) or Bypass (Green) using the EPO key control on the door 
to the control cabinet. 
d. 
Verify that the EPO buttons are in the reset position (not depressed). 
 
IT critical power feed cabinets A and B 
a. 
Close all fuses in power cabinets A and B. 
b. 
Close all non-spare breakers in power cabinets A and B. 
c. 
Close and lock power cabinet doors A and B. 
d. 
Close and lock the fire suppression cabinet door. 
 
Standard power up procedure 
Perform the following procedures in the exact order in which they are listed.