Инструкции Пользователя для Heat & Glo 6000TR-OAK

Скачать
Страница из 31
Heat & Glo  •  6000TR-OAK, 6000TR-OAK-IPI  •  383-901  Rev. K  •   5/06
25
Figure 26.  Ceiling Firestop (Ceiling Side)
If the area above the ceiling 
IS an attic, position and secure
the firestop on top of the previously framed hole.
NOTE: Keep insulation away from the vent pipe at least
1 inch (25mm).
Figure 27.    Attic Firestop
JOIST
CEILING FIRESTOP
CEILING
NAILS (4 REQUIRED)
CEILING
CEILING FIRESTOP
RAFTER
NAILS (4 REQUIRED)
NOTE: There must be NO INSULATION or other
combustibles inside the framed firestop opening.
Figure 28.  Trapezoid Termination Cap
!
C.  Vent Termination
Refer to Cinch Pipe and Termination Cap installation in-
structions.
Horizontal Termination
• The termination kit should pass through the wall firestops
from the exterior of the building.
• Adjust the termination cap to its final exterior position
on the building and interlock the flue sections.
!
WARNING:  VENTING TERMINALS SHALL
NOT BE RECESSED INTO A WALL OR SID-
ING.  VENT TERMINATION CLEARANCES MUST
BE FOLLOWED TO AVOID FIRE DANGER. SEE
VENT TERMINATION MINIMUM CLEARANCES DI-
AGRAM ON FOLLOWING PAGE.
WARNING:  THE TERMINATION CAP MUST BE
POSITIONED SO THAT THE ARROW IS POINT-
ING UP.
7-1/4 in.
(184mm)