6. PLUMBING
1. Plumbing connections are similar to a traditional "tank 
cross"  or  "tank  tee".  Provisions  are  made  for  popular 
line sizes via a 1-1/4" NPT male outer thread and a 1" 
NPT  female  inner  thread.  The  plumbing  connections 
are  not  directional  and  allow  flow  from  either  side. 
When attaching valves or fittings, uses the wrench flats 
provided.
 
 
EXPLOSION HAZARD. Failure to follow 
these  instructions  can  cause  a  rupture  or  explosion 
possibly causing serious or fatal injury, flooding, and/or 
property damage.
2. Install the supply piping from the well pump. If required, 
install a spring-loaded check valve.
3. Install a shutoff (service) valve on the outgoing line. This 
will allow the Well-X1
 to be tested prior to pressurizing 
the  entire  system.  DO  NOT  place  a  shutoff  on  the 
incoming supply line.
 
NOTE: The relief valve is sized for a maximum flow rate of 
10 gpm at 125 psi. If the pump installation allows higher 
flow rates, an additional relief valve must be installed.
WATER
CONNECTIONS
CHECK
VALVE