Справочник Пользователя для Raritan Computer Paragon II 255-30-6000-00
Appendix I: Troubleshooting
215
For configurations where Paragon switches are added, replaced, or
swapped (in order), we recommend:
swapped (in order), we recommend:
1. Power ON the third tier (if a third tier exists).
2. Power ON the second tier.
3. Power ON the Paragon II base tier (first tier).
4. Perform a partial reset of the database on impacted switches. For
example, if you swap the switches connected to the base tier, perform
the partial reset on the base tier. If you swap the switches connected
to the second tier, perform the partial reset from the second tier to the
base tier.
the partial reset on the base tier. If you swap the switches connected
to the second tier, perform the partial reset from the second tier to the
base tier.
User stations can be powered ON and OFF at any time as needed.
There is a five‐second ON/OFF down time in the matrix switch or
Paragon II power cycle.
Paragon II power cycle.
Paragon II FAQs Online
Frequently Asked Questions for Paragon II are now located online at
Raritanʹs Frequently Asked Questions (FAQ) webpage
(http://www.raritan.com/support/technicalfaq).
Raritanʹs Frequently Asked Questions (FAQ) webpage
(http://www.raritan.com/support/technicalfaq).