Raritan Computer Paragon II 255-30-6000-00 用户手册

下载
页码 239
 
Appendix I: Troubleshooting 
 
 
215
 
 
For configurations where Paragon switches are added, replaced, or 
swapped (in order), we recommend:  
1.  Power ON the third tier (if a third tier exists). 
2.  Power ON the second tier. 
3.  Power ON the Paragon II base tier (first tier). 
4.  Perform a partial reset of the database on impacted switches. For 
example, if you swap the switches connected to the base tier, perform 
the partial reset on the base tier. If you swap the switches connected 
to the second tier, perform the partial reset from the second tier to the 
base tier. 
User stations can be powered ON and OFF at any time as needed. 
There is a five‐second ON/OFF down time in the matrix switch or 
Paragon II power cycle. 
 
Paragon II FAQs Online 
Frequently Asked Questions for Paragon II are now located online at 
Raritanʹs Frequently Asked Questions (FAQ) webpage 
(http://www.raritan.com/support/technicalfaq).