Справочник Пользователя для Hoshizaki KMS-1401MLJ
15
• Minim
um fr
eez
e time:
5 min.
• Maxim
um fr
eez
e time:
fr
eez
e timer set
ting
(S4 dip s
witch 9 & 1
0).
2. Sequence Flow Chart
Components Ener
giz
ed when the Contr
ol S
witc
h is in the "SER
VICE" P
osition
W
hen in the "SER
VICE" position, the contr
ol s
witch supplies po
w
er t
o the ser
vice s
witch and the icemak
er is in ser
vice mode
.
The ser
vice s
witch has thr
ee positions:
"DRAIN," "CIRC
." and "W
A
SH." See the inf
or
mation belo
w f
or det
ails of each function.
DRAIN
P
ow
er is supplied t
o the pump and dr
ain v
al
ve
. This dr
ains the w
at
er t
ank.
CIRC
.
P
ow
er is supplied t
o the pump onl
y.
This oper
ation can be used t
o cir
culat
e cleaner and
sanitiz
er o
ver the outside surf
ace of the e
vapor
at
or f
or e
xt
ended per
iods of time
.
WA
S
H
P
ow
er is supplied t
o the pump and w
ash v
al
ve
. This oper
ation is used t
o cir
culat
e cleaner
and sanitiz
er o
ver both the inside and outside surf
aces of the e
vapor
at
or
.
4.
P
ump-Out Cy
cle
1.
1
-Min
ut
e
F
ill Cy
cle
2.
Har
vest Cy
cle
3.
F
reez
e Cy
cle
Cy
cle
St
eps
WV1
ener
giz
ed
F/S
open
F/S
closed
Comp
ener
giz
ed
FMRs
ener
giz
ed
HGVs
ener
giz
ed
WV2
ener
giz
ed
WV1
de-ener
giz
ed
Ther
mist
or t
emper
atur
e r
eaches
48
°F (9°C) (3.9 k
Ω
or less).
Har
vest timer st
ar
ts (1 t
o 3 min.).
F/S
open
Comp
contin
ues
FMRs
contin
ue
PM
contin
ues
LL
Vs
ener
giz
ed
WV1
ener
giz
ed fir
st 1 min.
of fr
eez
e
HGVs
de-ener
giz
ed
F/S
closed
Comp
contin
ues
FMRs
contin
ue
HGVs
ener
giz
ed
D
V & PM
de-ener
giz
ed
2
sec.,
then
ener
giz
ed f
or 1
0/20 sec.
LL
Vs
de-ener
giz
ed
F/S
chec
k
F/S
chec
k
•
WV2 time:
6 min.
or the length of har
vest min
us 50 sec.
(S4 dip s
witch 7), whiche
ver is shor
ter
.
• Maxim
um har
vest time:
20 min.
Ther
mist
or
in contr
ol
1 t
o 3-min.
har
vest timer in contr
ol
(S4 dip s
witch 1 & 2)
5-min.
minim
um
fr
eez
e timer in
contr
ol
F/S
in contr
ol
St
ar
tup
If
F/S
is open, C
omp st
ops and c
ycle r
etur
ns t
o 1
-min.
fi
ll.
Fact
or
y set f
or e
ver
y
10th c
ycle
.
(S4 dip s
witch 5 & 6)
50 sec.
PM
ener
giz
ed
WV2
de-ener
giz
ed
Har
vest P
ump
Timer
F/S
opens or fr
eez
e
timer t
er
minat
es
1.
Bin F
ull
Shutdo
wn Dela
y:
•
Fill Cy
cle
– 1
5 sec.
af
ter activ
ation.
•
Har
vest Cy
cle
–
At the end of the har
vest c
ycle
, or up t
o 1
5 sec.
int
o the
fr
eez
e c
ycle if activ
at
ed at the end of the har
vest c
ycle
.
•
Fr
eez
e Cy
cle
– 1
5
sec.
af
ter activ
ation if activ
at
ed at least 1
5 sec.
bef
or
e
the 5-min.
shor
t c
ycle pr
ot
ection timer t
er
minat
es
.
Otherwise
, at the end of the ne
xt har
vest c
ycle
.
Shutdo
wn
and R
estar
t
BC Oper
ation
BC
open (BC actuat
or paddle eng
aged)
Gr
een "BC CL
OSED" LED of
f
Yello
w "BC OPEN" LED on
Yello
w "BC OPEN" LED contin
ues
All components de
-ener
giz
ed
2.
Icemak
er Of
f
All
components
de-ener
giz
ed.
3.
Ice Le
vel Lo
w
er
ed
Icemak
er st
ar
ts at "1
. 1
-Min
ut
e F
ill C
ycle
."
To 1 abo
ve
BC
closed (BC actuat
or paddle diseng
aged)
Gr
een "BC CL
OSED" LED on
Yello
w "BC OPEN" LED of
f
Leg
end:
Comp
-compr
essor
DV
-dr
ain v
al
ve
FMRs
-f
an mot
or
s-r
emot
e
F/S
-fl
oat s
witch
HGVs
-hot g
as v
al
ves (KMS and SRK)
LL
Vs
-liquid line v
al
ves (KMS and SRK)
PM
-pump mot
or
WV1
-fi
ll/r
efi
ll w
at
er v
al
ve
WV2
-har
vest w
at
er v
al
ve
"G" Contr
ol Boar
d Sequence Flo
w Char
t
KMS-1
40
1MLJ with SRK-1
4J/3
1 min.
R
efi
ll