Справочник Пользователя для Mitsubishi Electronics SW2D5C-GTD2-E

Скачать
Страница из 234
5.5   Opening the Project
   
5 - 61
1
OV
ER
VI
EW
2
SYS
TEM 
CONFIGURA
T
ION
3
SPEC
IFI
CA
TIO
NS
4
SC
R
EE
N
 
CONF
IGURA
TION
5
O
PERA
T
IN
METHO
D
6
FUNC
TIONS
7
IN
TERN
AL
 DE
VI
CE 
IN
TE
R
FAC
FU
NCTION
8
TR
OU
BL
ES
HO
O
TI
N
G
A
PPENDICES
5.5 Opening the Project
Set a project data for monitoring and start monitoring.
1
Perform either of the following operations.
• Click 
 (Open a GT Designer2 file.).
• Select [Project] 
 [Open] from the menu.
• Right-click the mouse and select [Open] from the menu.
2
The Open a GT Designer2 file. dialog box is displayed.
Set up the following items and click the 
 button.
Item
Description
Look in
Selects the area where the project data is saved.
File name
Sets project data name for monitoring.
Files of type
Selects a file format of the project data.
GT Designer2 file(*.gte)
: GTE format
Open