Справочник Пользователя для Lucent Technologies Release 8.2

Скачать
Страница из 524
Configuration 5B: R8csi <—ppp—> R8r (2 C-LANs) 
<—ethernet—> R8si 
191
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000
CID: 77730
3  
C-LAN Administration
Switch 2 Task — Assign Link via ppp Data Module to Switch 1
This task administers a ppp data module on Switch 2 for the ppp connection to Switch 
1. The data module associates a link number with a port address, extension number, 
and node name for the C-LAN port used for this connection.
Begin
Steps
Open Data Module form — enter 
ad da 3020
> Enter values
add data-module 3020 
                                                                 Page 1 of x
                      
    DATA MODULE
    Data Extension: 3020            Name: _ppp on link 1 to node-1a-ppp BCC: 2
              Type: ppp
    
COS: 1
              Port: 01a0413 COR: 
1
              Link: 1_           
TN: 1
       Enable Link? n
         Node Name: node-2___
_
Subnet Mask: 255.255.255.0 
Establish Connection: n
DESTINATION
            Digits: 
__________
      Node Name: node-1a-ppp______
              CHAP? n
Field
Conditions/Comments
Type:
This indicates the data-module type for this connection.
Port:
In this example, the C-LAN circuit pack is in slot 01a04; the ppp 
connection is through port 13.
Link:
The link number must be in the range 1 – 25 (for R8csi), not 
previously assigned on this switch
Enable Link?
If you need to add an IP route that uses this node as a gateway, 
this field must be set to 
y
 before adding the IP route. Otherwise 
leave this field set to 
n
 until the link administration is complete; 
that is, until after all data modules and the processor channels 
are assigned, then set to 
y
.
Name:
Information-only; appears in list generated by the “list data 
module” command.
BCC:
Bearer Capability Class. This is a display-only field.
1 of 2