Справочник Пользователя для Lucent Technologies Release 8.2

Скачать
Страница из 524
Configuration 1: R8r <—ppp—> R8si 
3  
C-LAN Administration
Administration for Network Connectivity
CID: 77730
555-233-504 — Issue 1 — April 2000
70
Switch 2 Task — Assign Processor Channels
This task associates data links (hardware) with processor channels (software) on 
Switch 2.
Begin
Steps
Open the Processor Channel Assignment form — enter  
ch com p
> Enter values
change communications-interface processor-channels
                                                                    Page 1 of X
PROCESSOR CHANNEL ASSIGNMENT
Proc                Gtwy        Interface    Destination      Session    Mach
Chan Enable  Appl.  To  Mode  Link/Chan   Node       Port  Local/Remote  ID
  1:
 n 
_______ 
_    __  _____  __________  0____  ___   ___    __
  2:
 n 
_______ 
_    __  _____  __________  0____  ___   ___    __
:
21: y
 
dcs ___
c
3_  0____ node-1____   
5003 
21_
12_    1_
:    
 64:
 n 
_______ 
_    __  _____  __________  0____  ___   ___    __
Field
Conditions/Comments
Processor Channel 21
: (ppp connection to Switch 1)
Enable
Set to 
y
.
Appl.
Set to 
dcs
 for DCS signaling.
Mode
Node-2 is the “client” for this session. Set node-1 to “server” 
(
s
).
Interface Link
This must match the link number on the node-2 data module 
screen in the previous task.
Interface Chan
A value of 
0
 allows any available interface channel to be used 
for this connection. The Destination Port number on the 
Switch-1 Processor Channel screen must also be set to 
0
.
Destination Node
Name of the far-end node for this channel. This must be a 
name entered on the Node Names screen. For ppp 
connections, it must match the Destination Node Name 
entered on the ppp Data Module screen.
Destination Port
This number must match the Interface Channel number 
assigned on the Switch-1 Processor Channel screen.
1 of 2