Справочник Пользователя для RuggedCom RS900

Скачать
Страница из 42
RS900 Family Installation Guide 
 
2.2.4  Dielectric Strength Testing 
 
Units which are to have dielectric strength testing (HIPOT testing) done in the field must have the 
braided ground cable disconnected during the test. This is required in order to prevent the surge 
suppression circuitry, which is connected to surge ground, from being activated. 
 
 
Figure 7 - Dielectric Strength Testing 
 
Page 19 of 42 
© 2008 RuggedCom Inc. All rights reserved. 
 
Rev100