Справочник Пользователя для Mitsubishi Electronics #NAME?

Скачать
Страница из 96
5
SETTINGS AND PROCEDURES BEFORE 
OPERATION
5.3 Extension Safety Relay Module
5.3.1 Start-up procedures
5
 - 16
1
O
V
ER
VI
E
W
2
S
YST
EM
 
CONF
IGURA
T
ION
3
S
P
E
C
IF
ICA
T
IONS
4
F
UNCT
IO
NS
5
S
E
T
T
INGS
 A
ND 
PR
O
C
E
DURES
 BEF
ORE 
OP
E
R
A
T
ION
6
T
R
O
U
BL
ESH
O
O
T
ING
AP
PENDI
X
Figure 5.10 Start-up procedures (2/2)
POINT
When powering ON the system, make sure to power ON the safety power supply 
first, and then the module power supply.
If the module power supply is powered ON first, monitor signals cannot be read 
properly.
For details, refer to Section 6.3.
Connect the start-up switch between 
XS0 and XS1.
Start-up mode
Start-up mode
Auto mode
Auto mode
Manual mode
Manual mode
Check the wiring and settings.
Power-ON
Turn ON the start-up switch.
Check the operating status with LED 
and others.
End
(From previous page)