Справочник ПользователяСодержаниеModel Identification4Customer Service6Wiring Diagram6Serial Plate Location6Safety Information7Important Safety Instructions8Specifications and Dimensions10Cabinet Dimensions11Exhaust Outlet Locations12Gas Connection Locations13Electrical Connection Locations14Steam Connection Locations15Installation16Pre-Installation Inspection16Location Requirements17Position and Level the Tumbler18Bolt-On Angle Option18To Reverse the Loading Door20Before Placing Tumbler into Service23Required for CE Models Only24Installing CE Gas Drying Tumblers24General Information24Basic Configuration26Specific Conversion Procedures26Exhaust Requirements29Layout29Make-Up Air29Venting29Individual Venting30Manifold Venting30Gas Requirements34Gas Supply Pipe Sizing and Looping36High Altitude Burner Orifice Sizing38Electrical Requirements39Grounding Instructions39For CE Models Only39Service/Ground Location40To Connect Electrical Service To The Tumbler41Jumper Configuration Instructions43Ferrite Ring Installation4350 Pound Gas and Steam Models4475 Pound Gas and Steam Models4550 and 75 Pound Electric Models46Steam Requirements47Piping Recommendations48Thermal Oil Prep48Single Drop Timer50Power-Up Mode50Ready Mode50Start Mode50Run Mode50Setting Dry Time Dipswitches50Dipswitch Settings51Rotary Coin Drop Timer53Installing Accessory Timing Cam53Removal of Existing Timing Cam53Installation of New Timing Cam53Adjustments54Gas Burner Air Shutter54Airflow Switch55Gas and Electric Tumblers55Loading Door Switch57Loading Door Catch57Drive Belt57Nonreversing Models57Reversing Models57Removing Tumbler from Service60Размер: 2,3 МБСтраницы: 62Язык: EnglishПросмотреть