Teledyne Percent Oxygen Analyzer 用户手册

下载
页码 51
Percent Oxygen Analyzer  
Installation 
 
 
 Teledyne 
Analytical 
Instruments 
23
 
Installation 
Installation of the analyzer includes: 
1.  Unpacking the system. 
2.  Mounting the control unit. 
3.  Installing the probe. 
4.  Making electrical connections.  
5.  Testing the installation. 
CAUTION: 
READ THIS CHAPTER IN ITS ENTIRETY BEFORE 
INSTALLING THE SYSTEM. 
 
FOR INDOOR USE ONLY. 
3.1 Unpacking the Analyzer 
As soon as you receive the instrument, carefully unpack and inspect 
the control unit, and any included accessories for damage. Immediately 
report any damage to the shipping agent. The analyzer is shipped with 
all the materials you need to install and prepare the system for operation. 
3.2 Control Unit Installation 
The 9060L control unit is designed to be panel mounted in a 
general purpose, indoor area, away from moisture and the elements. The 
unit should be installed at viewing level in a sheltered area. 
Refer to the Outline Diagram D-77712 in the Appendix for the 
physical dimensions of the analyzer. 
3.3 9060L Oxygen Probe Installation 
To install the probe, weld a BSP or NPT socket to the flue in a 
suitable position for flue gas sensing.
 
 For the correct size of socket refer 
to probe specifications located in the Appendix.