Dynatech PN 106082: 115v 用户手册

下载
页码 46
Page 4 - 6  
 
ITW Dynatec c. 1999 
Revised 1/99                                                                    
TPC-2 TIMER Manual #50-05 
 
NOTE
: The SPIKE TIME parameter is not accessible when programming EVENT2 
through EVENT4. Programming of SPIKE TIME for each CHANNEL occurs only 
during EVENT1. 
27. Depress the CHANNEL 1 button until the LED to the left of EVENT is illuminated. 
28. Rotate the VALUE knob until 3 is displayed. This indicates the programming of 
EVENT 3 of the selected Program. EVENT 3 is a solid glue line. 
29. Depress the CHANNEL 1 button until the LED to the left of DELAY is illuminated. 
30. Use the DIGIT button and VALUE Knob to set the display to 0240 (240ms, the sum 
of DELAY1, LINE1, DELAY2, LINE2 and DELAY3). 
31. Depress the CHANNEL 1 button until the LED to the left of LINE is illuminated. 
32. Use the DIGIT button and VALUE Knob to set the display to 0060 (60ms). 
33. Depress the CHANNEL 1 button until the LED to the left of GAP is illuminated. 
34. Use the DIGIT button and VALUE knob to set the display to 0000 (or 0ms). EVENT3 
is a solid line, so no GAP is required. 
35. Depress the CHANNEL 1 button until the LED to the left of STITCH is illuminated. 
36. Use the DIGIT button and VALUE knob to set the display to 0000 (or 0ms). EVENT3 
is a solid line, so no STITCH is required. 
37. Repeat Step #5 through Step #36 above for CHANNEL 2. 
38. Depress the RUN/STOP button until the LED above this button is illuminated. The 
glue system is now ready for operation. 
At this point some product should be run. Examine the finished product to assure the 
TPC-2 Control Unit’s time settings suit the line speed of the machine. If incorrect, follow 
the above procedure and change values where necessary.