Nortec Industries GSP Indoor 用户手册

下载
页码 46
 
 
10-40 
Page 36 
2008-10-01
 
D. Training 
(1) 
Training of the Owner’s operation and maintenance personnel is required in 
cooperation with the Commissioning Authority.  Provide competent, factory 
authorized personnel to provide instruction to operation and maintenance 
personnel concerning the location, operation, and troubleshooting of the installed 
systems.  The instruction shall be scheduled in coordination with the 
Commissioning Authority after submission and approval of formal training plans.  
Refer to System Demonstrations, section 01670, for contractor training 
requirements.  Refer to section 01810, Commissioning, for further contractor 
training requirements. 
 
XXXXX OR XXXXX 
(2) 
Engage a factory-authorized service representative to train Owner’s maintenance 
personnel to adjust, operate, and maintain humidifiers. 
(a) 
Train Owner’s maintenance personnel on procedures and schedules for 
starting and stopping, troubleshooting, servicing, and maintaining equipment 
and schedules. 
(b) 
Review data in maintenance manuals.  Refer to Division 1 Section “Contract 
Closeout.” 
(c) 
Review data in maintenance manuals.  Refer to Division 1 Section “Operation 
and Maintenance Data.” 
(d) 
Schedule training with Owner, through Architect, with at least seven days 
advance notice.