New Buck Corporation DV23ZC 用户手册

下载
页码 33
INSTALLATION 
VERTICAL TERMINATION (continued) 
 
5.  Slip the flashing over the Pipe Section(s) protruding through the roof.  Secure the base of the 
Flashing to the roof with roofing nails.  Ensure the roofing materials overlap the top edge of 
the Flashing as shown in Figure 12.  Verify that you have at least the minimum clearance to 
combustibles at the roof line. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 12 
 
6.  Continue to add Pipe Sections until the height of the Vent Cap meets the minimum building 
code requirements described in Figure 13.  Note that for steep roof pitches, the vent height 
must be increased.  High wind conditions, nearby trees, adjoining roof lines, steep pitched 
roofs, and other factors can result in poor  draft, or down drafting.  In these cases, increasing 
the vent height may solve this problem. 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 13 
 
7.  Twist-lock the vent cap. 
ROOF PITCH 
FLAT TO 7/12 
OVER 7/12 TO 8/12 
OVER 8/12 TO 9/12 
OVER 9/12 TO 10/12 
OVER 10/12 TO 11/12 
OVER 11/12 TO 12/12 
OVER 12/12 TO 14/12 
OVER 14/12 TO 16/12 
OVER 16/12 TO 18/12 
OVER 18/12 TO 20/12 
OVER 20/12 TO 21/12 

1.5 

2.5 
3.25 




7.5 
0.30 
0.46 
0.61 
0.76 
0.99 
1.22 
1.52 
1.83 
2.13 
2.20 
2.44 
MIN. HEIGHT 
FEET       METERS  
15