Ariston G.C.N.:47-116-67 (38 kW) 用户手册
21
installation
Fitting the Coaxial Flue
(Ø 60 / 100 Vertical)
Note: See table for maximum and minimum fl ue runs.
Contents:
1x Conical Adaptor (60/100mm)
1x Vertical Flue Kit (80/125mm)
1x Conical Adaptor (60/100mm)
1x Vertical Flue Kit (80/125mm)
The vertical fl ue kit is supplied with a specially designed weather
proof terminal fi tted, it can be used either with a fl at roof or a
pitched roof.
proof terminal fi tted, it can be used either with a fl at roof or a
pitched roof.
The Vertical fl ue kits useable lengths with the pitched roof
fl ashings are indicated in Fig. 7.
fl ashings are indicated in Fig. 7.
Before proceeding to fi t the fl ue, ensure that the maximum fl ue
length has not been exceeded (See the tables) and that all elbows
and bends have been taken into consideration, for each additional
90° elbow 1 metre must be subtracted from the total fl ue length,
and for each 45° 0.5 metres must be subtracted from the total fl ue
length (the height of the vertical adaptor and a 45° bend can be
seen in Fig. 8).
length has not been exceeded (See the tables) and that all elbows
and bends have been taken into consideration, for each additional
90° elbow 1 metre must be subtracted from the total fl ue length,
and for each 45° 0.5 metres must be subtracted from the total fl ue
length (the height of the vertical adaptor and a 45° bend can be
seen in Fig. 8).
Mark the position of the fl ue hole in the ceiling and/or roof (see
Fig. 7 for distance from wall to the centre of the fl ue).
Fig. 7 for distance from wall to the centre of the fl ue).
Cut a 130mm diameter hole through the ceiling and/or roof and
fi t the fl ashing plate to the roof.
fi t the fl ashing plate to the roof.
DO NOT cut the vertical fl ue kit.
To connect the vertical fl ue kit directly to the boiler, place the
vertical starter kit (Part No. 3318079) (see Fig. 7) onto the exhaust
manifold and secure with the clamp, fi t the vertical adaptor onto
the vertical starter kit (note: there is no need to use a clamp to
secure this as it is a push fi t connection), the vertical fl ue kit must
then be inserted through the roof fl ashing, this will ensure that
the correct clearance above the roof is provided as the terminal
is a fi xed height.
vertical starter kit (Part No. 3318079) (see Fig. 7) onto the exhaust
manifold and secure with the clamp, fi t the vertical adaptor onto
the vertical starter kit (note: there is no need to use a clamp to
secure this as it is a push fi t connection), the vertical fl ue kit must
then be inserted through the roof fl ashing, this will ensure that
the correct clearance above the roof is provided as the terminal
is a fi xed height.
Should extensions be required, they are available in 1 metre
(Part No. 3318077), 500mm (Part No. 3318078) and they must be
connected directly to the vertical starter kit before connecting the
adaptor to allow the vertical fl ue kit to be fi tted. In the event that
extension pieces need to be shortened, they must only be cut at
the male end and it must be ensured that the inner and outer fl ue
remain fl ush.
When utilising the vertical fl ue system, action must be taken to
ensure that the fl ue is supported adequately to prevent the weight
being transferred to the appliance fl ue connection by using 1 fl ue
bracket per extension.
(Part No. 3318077), 500mm (Part No. 3318078) and they must be
connected directly to the vertical starter kit before connecting the
adaptor to allow the vertical fl ue kit to be fi tted. In the event that
extension pieces need to be shortened, they must only be cut at
the male end and it must be ensured that the inner and outer fl ue
remain fl ush.
When utilising the vertical fl ue system, action must be taken to
ensure that the fl ue is supported adequately to prevent the weight
being transferred to the appliance fl ue connection by using 1 fl ue
bracket per extension.
When the fl ue passes through a ceiling or wooden fl oor, there
must be an air gap of 25mm between any part of the fl ue
system and any combustible material. The use of a ceiling plate
will facilitate this. Also when the fl ue passes from one room to
another a fi re stop must be fi tted to prevent the passage of smoke
or fi re, irrespective of the structural material through which the
fl ue passes.
must be an air gap of 25mm between any part of the fl ue
system and any combustible material. The use of a ceiling plate
will facilitate this. Also when the fl ue passes from one room to
another a fi re stop must be fi tted to prevent the passage of smoke
or fi re, irrespective of the structural material through which the
fl ue passes.
180 mm
Vert Adaptor
(supplied with flue kit)
(supplied with flue kit)
Vertical Starter
Part No: 3318079
Part No: 3318079
* This length will vary
according to the type
of flashing installed
according to the type
of flashing installed
Total length
of Vertical Kit
1355 mm
Useable length
of Vertical flue
690 mm*
Fig. 7
Fig. 8