Oritron ICS-2100 用户手册

下载
页码 288
Doc. 065291-01 3/09
49
3 • Operation and Maintenance
This chapter describes routine operating and maintenance procedures for the ICS-
2100.
The ICS-2100 is designed for IC (ion chromatography) applications and should 
not be used for any other purpose. Operation of the ICS-2100 in a manner not 
specified by Dionex may result in personal injury.
3.1
Operation Overview
 illustrates the basic steps for routine operation of the ICS-2100.
Figure 3-1.  Operation Flow Chart
Power up the system
Set up the reservoir 
(or RFIC-ER system)
Start Chromeleon
Check all 
connections
Prime the pump
Set operating 
conditions
Equilibrate the 
system
Verify operating 
status
Process samples
Prepare samples