VENT INSTALLATION 
4.  Connect a section of pipe and extend up through the hole.
NOTE: If an offset is needed to avoid obstructions, you must support the vent pipe every three (3) feet. Use wall 
straps for this purpose. See Figure 25, page 22. Whenever possible, use 45
° elbows instead of 90° elbows. The 45° 
elbow offers less restriction to the flow of the flue gases and intake air.
5.  Place the flashing over the pipe section(s) extending through the roof. Secure the base of the flashing to the roof and framing 
with roofing nails. Be sure roofing material overlaps the top edge of the flashing. There must be a 1" clearance from the vent 
pipe to combustible materials. 
6.  Continue to add pipe sections until the height of the vent cap meets the minimum building code requirements.
NOTE: You must increase vent height for steep roof pitches. Nearby trees, adjoining roof lines, steep pitched roofs, 
and other similar factors may cause poor draft or down-drafting in high winds. Increasing the vent height may solve 
this problem.
NOTE: If the vent pipe passes through any occupied areas above the first floor, including storage spaces and closets, 
you must enclose pipe. You may frame and sheetrock the enclosure with standard construction material. Make sure 
to meet the minimum allowable clearances to combustibles. Do not fill any of the required clearance spaces with 
insulation.  
Figure 30 - Cathedral Ceiling Support Box Installation 
Figure 31 - Installed Cathedral Ceiling 
Support Box
CATHEDRAL CEILING INSTALLATION
IMPORTANT:  Review  all  information  on  previous  page 
before  planning  this  installation.  Cathedral  ceiling 
installations can be very tricky. 
1.  Remove shingles or other roof covering as necessary to cut 
the rectangular hole for the support box. Mark the outline 
of the cathedral ceiling support box on the roof sheathing 
using the locating hole as a center point.
2.  Cut the hole 
1
/
8
" larger than the support box outline. See 
Figure 30.
3.  Lower the support box through the hole in the roof until 
the bottom of the box extends at least 2" (
51 mm
) below the 
ceiling. See Figure 30. Align the support box vertically and 
horizontally using a level. Temporarily tack the support box 
in place through the inside walls and into the roof sheet-
ing. 
4.  Using tin snips, cut the support box from the top corners 
down to the roofline and fold the resulting flaps over the 
roof sheeting. See Figure 31. Apply a bead of non-hardening 
mastic around the top edges of the support box to make a 
seal between the box and the roof. Nail in place with roof-
ing nails. Remove any combustible material that might be 
inside the support box.
5.  Complete  the  cathedral  ceiling  installation  by  following 
the same procedure outline
d
 in steps 2 through 6 for Flat 
Ceiling Installation, page 23 and above. 
Level 
Cathedral 
Ceiling Support 
Box 
2" Minimum 
Below 
Finished 
Ceiling 
Cut Hole 1/8" Larger 
than Support Box 
when Projected onto 
Roofline.
Apply Non-hardening 
Mastic Under all Edges of 
Support Box before Nailing