Husqvarna CS 2512 用户手册

下载
页码 70
14 - English
 
  
 Operation
Operator's Manual CS 2512
Operation
Sawing
When all the equipment has been assembled cutting can 
start. In order for the saw to cut as efficiently as possible it 
should be started as follows:
1. Close the valve on the pressure reduction block by 
turning the knob anti-clockwise until it stops and then 
two turns back.
2. Start the hydraulic unit.
3. Set the feeding flow on the unit to max by turning the 
control on the remote control clockwise.
4. Tension the wire by carefully turning the knob on the 
pressure reduction block clockwise until the wire is 
tensioned sufficiently. Make sure to always check that 
the wire is seated correctly in all the wheels on the 
saw.
5. Start the motor's rotation by turning the control for 
motor rotation on the remote control clockwise.
6. Carefully increase the motor speed by turning the 
control for motor rotation. A suitable working pressure 
when cutting usually lies between 100 and 130 bar, but 
varies depending on how many wheel sets are used in 
the magazine, how much wire is in use and the 
hardness of the material to be cut.
7. As the material is cut away the working pressure 
drops, which is shown on the display, and the 
magazine must then be tensioned. Do this by turning 
the knob on the pressure reduction block clockwise.
8. The output tension on the magazine is shown by an 
indicator on the machine (shown in the min position). 
When the magazine cylinder is fully tensioned, the 
machine must be stopped and the wire must be wound 
around a new wheel set. Then continue to cut as 
above.
CAUTION
In order for the water to cool the wire as 
intended during cutting, it is essential to adjust 
the position of the cooling water as the 
material is cut. Remember to always stop the 
machine when you do this.
Finishing sawing
1. Lower the speed on the wire and allow the motor to 
stop completely.
2. Fold up the magazine arm.
3. Disconnect the incoming mains cable from the 
hydraulic unit.
4. Disconnect the hydraulic hoses and the water hose 
from the saw unit.
5. Other steps are done in the reverse order.