Powermatic PJ-882 用户手册

下载
页码 144
 
13
Three-Phase Test Run 
On the three-phase unit, after wiring has been 
completed, you should check that the wires 
have been connected properly: 
1.  Connect machine to power source and 
press the start button, shown in Figure 10. 
(See “Operating Controls” on page 25 for 
further information on the control switch.) 
2.  The cutterhead should rotate clockwise as 
viewed from the front of the machine. If  the 
cutterhead rotation is incorrect, press the 
stop button (Figure 10) and disconnect 
machine from power. 
 
3.  Switch any two of the three wires at "R,S,T". 
 
Adjustments 
Drive Belt Tension 
To check or adjust the drive belt tension: 
1.  Unscrew the knob (A, Figure 11) and 
remove the belt guard (B, Figure 11). 
2.  Remove the rear panel (C, Figure 11) by 
unscrewing the four flat head screws (D, 
Figure 11) with a cross-point screwdriver. 
3.  Proper drive belt tension is achieved when 
there is a small amount of deflection in the 
drive belt midway between the pulleys, 
when using moderate finger pressure 
(Figure 12). 
4.  To increase the tension on the drive belt, 
loosen the lower hex nut (B, Figure 13) with 
a 17mm wrench, and tighten the top hex nut 
(A, Figure 13). When finished, tighten lower 
hex nut (B, Figure 13).  
5.  Re-install rear panel and belt guard. 
 
NOTE: After operating the machine for a short 
time, the drive belt tension should be re-
checked, as the new drive belt may stretch 
slightly during the “breaking-in” period. 
 
Drive Belt Replacement 
1.  Unscrew the knob (A, Figure 11) and 
remove the belt guard (B, Figure 11). 
2.  Remove the rear panel (C, Figure 11) by 
removing the four flat head screws with a 
cross-point screwdriver. 
 
 
Figure 10 
 
Figure 11 
 
Figure 12 
 
Figure 13