Scheduling Outlet Actions (Web Interface Only)
Actions you can schedule
For any outlets you select, you can schedule any of the following actions to
occur daily; at intervals of one, two, four, or eight weeks; or only once.
occur daily; at intervals of one, two, four, or eight weeks; or only once.
To configure values for
Power On Delay
,
Power Off Delay
, and
Reboot Duration
. Although you must use the Web
interface to schedule outlet actions, you can set these values in
either the Web or control console interfaces.
either the Web or control console interfaces.
For an action to be applied to an outlet group, you must have
outlet groups enabled at the beginning of the scheduled action.
For example, if
outlet groups enabled at the beginning of the scheduled action.
For example, if
Off Delayed
is scheduled for 4:00 p.m., the
Power
Off Delay
begins at 4:00 p.m. Even if you then enable outlet
groups during that
Power Off Delay
before any of the outlets are
scheduled to turn off, the action will be applied only to the
individual outlet and not the outlet group.
individual outlet and not the outlet group.
Option
Description
No Action
Do nothing.
On Immediate
Apply power to the selected outlets.
On Delayed
Apply power to each selected outlet according to its value for
Power
On Delay
.
†
Off Immediate
Remove power from the selected outlets.
† If an outlet group is selected, the configured delays and reboot duration of the lowest-
numbered outlet (for a local outlet group) or of the global outlet (for a global outlet group that
is initiating the action).
is initiating the action).