Scheduling Outlet Actions (Web Interface Only)
Actions you can schedule
For any outlets you select, you can schedule any of the following actions to 
occur daily; at intervals of one, two, four, or eight weeks; or only once.
To configure values for 
Power On Delay
Power Off Delay
, and 
Reboot Duration 
for each outlet, see 
. Although you must use the Web 
interface to schedule outlet actions, you can set these values in 
either the Web or control console interfaces.
For an action to be applied to an outlet group, you must have 
outlet groups enabled at the beginning of the scheduled action. 
For example, if 
Off Delayed
 is scheduled for 4:00 p.m., the 
Power 
Off Delay
 begins at 4:00 p.m. Even if you then enable outlet 
groups during that 
Power Off Delay
 before any of the outlets are 
scheduled to turn off, the action will be applied only to the 
individual outlet and not the outlet group.
Option
Description
No Action
Do nothing.
On Immediate
Apply power to the selected outlets.
On Delayed
Apply power to each selected outlet according to its value for 
Power 
On Delay
.
Off Immediate
Remove power from the selected outlets.
† If an outlet group is selected, the configured delays and reboot duration of the lowest-
numbered outlet (for a local outlet group) or of the global outlet (for a global outlet group that 
is initiating the action).