APC AP7900 用户手册

下载
页码 186
®
USER’S GUIDE
Switched Rack PDU
51
How to schedule an outlet event
1. From the menus of the Web interface, select
 Switched Rack PDU 
and 
then 
Scheduling
.
2. On the 
Outlet Scheduling 
page, select how often the event will occur: 
Daily
Weekly
, or 
One-Time
.
3. On the scheduling page, in the
 Name of event
 text box, replace the default 
name, 
Outlet Event
, with a name that will identify your new event.
4. Use the drop-down lists to select the type of event and when it will occur.
5. Use the check-boxes to select which outlets will be affected by the 
action. You can select one or more individual outlets or 
All Outlets
.
6. Click 
Apply
 to confirm the scheduling of the event, or 
Clear
 to cancel it.
When you confirm the event, the summary page is re-displayed, with the 
new event displayed in the list of scheduled events.
If you select 
Weekly
, you can choose to have the event occur 
once every week or once every two, four, or eight weeks.
The date format for one-time events is mm/dd, and the time 
format for all events is hh/mm, with the two-digit hour 
specified in 24-hour time. 
• An event that is scheduled daily or at one of the intervals 
available in the 
Weekly
 selection continues to occur at the 
scheduled interval until the event is deleted or disabled.
• You can schedule a one-time event to occur only on a 
date within 12 months of the date on which you perform 
the scheduling. For example, on June 4, 2004, you could 
schedule a one-time event on any date from the current 
date until June 3, 2005.