Baldor EXB009A01 用户手册
3-4 Installation
1-15HP Size A and B Controls (Continued)
Dual Expansion Board Installation
Procedure:
1.
Be sure drive operation is terminated and secured.
2.
Remove all power sources from the control.
3.
Wait at least 5 minutes for internal capacitors to discharge.
4.
Remove the four (4) Phillips head screws that secure the
control cover.
control cover.
5.
Remove the control cover.
6.
Remove the #6 screw at position MH1 (upper left on the
main circuit board. See Figure 3-1.
main circuit board. See Figure 3-1.
7.
Install the long standoffs provided in the installation
hardware as shown in Figure 3-1. (Be sure the
Male/Female standoff is at position MH1. The other three
are Female/Female.)
hardware as shown in Figure 3-1. (Be sure the
Male/Female standoff is at position MH1. The other three
are Female/Female.)
8.
Slide the Group 1 board male connector into the female
connector of the control board. See Figure 3-3.
connector of the control board. See Figure 3-3.
9.
Securely mount the Group 1 expansion board to the
standoffs installed in step 7 using the 4 short aluminum
standoffs provided in the installation hardware. See Figure
3-3.
standoffs installed in step 7 using the 4 short aluminum
standoffs provided in the installation hardware. See Figure
3-3.
10. The mechanical installation of the Group 1 expansion board
is now complete. Refer to the manual for the Group 1 board
and configure the jumpers as desired. Also complete the
wiring before you proceed to step 11.
and configure the jumpers as desired. Also complete the
wiring before you proceed to step 11.
11. Install the Group 2 board on top of the previously installed
Group 1 board by plugging the female connector onto the
male connector of the Group 1 board as shown in Figure
3-3.
male connector of the Group 1 board as shown in Figure
3-3.
12. Secure this Group 2 board to the Group 1 board using the
#6 screws provided.