Baldor EXB009A01 用户手册

下载
页码 30
3-4 Installation
1-15HP Size A and B Controls (Continued)
Dual Expansion Board Installation
Procedure:
1.
Be sure drive operation is terminated and secured.
2.
Remove all power sources from the control.
3.
Wait at least 5 minutes for internal capacitors to discharge.
4.
Remove the four (4) Phillips head screws that secure the
control cover.
5.
Remove the control cover.
6.
Remove the #6 screw at position MH1 (upper left on the
main circuit board.  See Figure 3-1.
7.
Install the long standoffs provided in the installation
hardware as shown in Figure 3-1.  (Be sure the
Male/Female standoff is at position MH1.  The other three
are Female/Female.)
8.
Slide the Group 1 board male connector into the female
connector of the control board.   See Figure 3-3.
9.
Securely mount the Group 1 expansion board to the
standoffs installed in step 7 using the 4 short aluminum
standoffs provided in the installation hardware. See Figure
3-3.
10. The mechanical installation of the Group 1 expansion board
is now complete.  Refer to the manual for the Group 1 board
and configure the jumpers as desired.  Also complete the
wiring before you proceed to step 11.
11. Install the Group 2 board on top of the previously installed
Group 1 board by plugging the female connector onto the
male connector of the Group 1 board as shown in Figure
3-3.
12. Secure this Group 2  board to the Group 1 board using the
#6 screws provided.