Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-639
EMG-XFER 
10
NOTE:
These tests only show up in the test sequence if there is a TN768 
Tone-Clock Board in the port network being tested.
Emergency Transfer Query Test (#124)
This test queries the hardware for the state of the Emergency Transfer switch (or 
switches in a High or Critical Reliability system) and reports the result. If the 
switch(es) is (are) in a position where the system software can control 
Emergency Transfer, then the test passes. If the switch(es) is (are) in a position 
where the system software cannot control Emergency Transfer, then the test fails. 
In the PPN, the Maintenance/Tape Processor controls Emergency Transfer and, 
in the EPN, the EPN Maintenance circuit pack controls Emergency Transfer. The 
system software does not have control of Emergency Transfer within a cabinet if 
the switch(es) is (are) in the manual ON or manual OFF state for that cabinet.
Table 10-185.
TEST #124 Emergency Transfer Query Test 
Error 
Code
Test 
Result
Description/Recommendation
1000
ABORT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2000
ABORT
Response to the test request was not received within the allowable time 
period.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2. If the test continues to ABORT with error code 2000, check for system 
powering problems with the A carrier (PPN or EPN). Resolve all 
DC-POWER alarms. Then, repeat the test.
3. If the test continues to ABORT with a 2000 error code, check for and 
resolve all DUPINT (Duplication Interface) errors in a PPN for a high or 
critical reliability system, or MAINT (EPN Maintenance circuit pack) 
errors in an EPN. Repeat the test.
2029
ABORT
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
1
FAIL
Emergency Transfer is manually turned OFF via the Emergency Transfer 
switch(es).
2
FAIL
Emergency Transfer is manually turned ON via the Emergency Transfer 
switch(es).
1. Place the switch (or switches in a PPN for a High or Critical Reliability 
system) in the AUTO position.
Continued on next page