Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-39
ADX16A-PT (AUDIX Analog Line/Control Link) 
10
f. The TDM bus is out of service. See the “TDM-BUS” section.
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below. By clearing 
error codes associated with the 
Loop Around Test #161
 for example, you may 
also clear errors generated from other tests in the testing sequence.
NO-OP Tests
The maintenance strategy for DEFINITY AUDIX emulates the one for ANL-16-L. 
The tests listed below apply only to ANL-16-L and not to DEFINITY AUDIX. These 
tests always return PASS.
Battery Feed Test (#35)
Audits and Updates Test (#36)
Station Present Test (#48)
Tests 36 and 48 ABORT when AUDIX is not running.
NPE Crosstalk Test (#6)
This test verifies that this port’s NPE channel talks on the selected time slot and 
never crosses over to time slots reserved for other connections. If the NPE is not 
working correctly, one-way and noisy connections may be observed. This test is 
part of the long test sequence and takes about 25 seconds to complete.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Loop Around Test (#161)
X
ND
Conference Test (#7)
X
ND
NPE Crosstalk Test (#6)
X
ND
Table 10-16.
TEST #6 NPE Crosstalk Test 
Error 
Code
Test 
Result
Description/ Recommendation
ABORT
Could not allocate the necessary system resources for this test. Try (a).
Continued on next page