Raritan Computer Paragon II 用户手册

下载
页码 116
20 
P
ARAGON 
II
 
U
SER 
G
UIDE 
 
 
 
H.  Press  F5 to return to the Administration Menu. Select Channel Configuration again. 
Select a channel port that has been configured for the subsidiary Base Unit you just set up. 
Press G to activate a dedicated Channel Configuration menu for the subsidiary Base Unit. 
I.  Edit the names of all server CPUs attached to this subsidiary Base Unit. Each highlight 
should turn green as you start typing. Press ENTER when finished with each name. Press 
S to save all of the new names. 
J.  Press  F2 to access the dedicated Selection Menu for that subsidiary Base Unit. Verify 
that new names appear in the Selection Menu in green. 
K.  If you are configuring a second-tier subsidiary Base Unit, and there are any third-tier 
Base Units attached to it, repeat steps C through J for a third-tier path. Press S to save the 
configuration. Press F2 to activate the third-tier Selection menu and verify that the third-
tier Base Unit is properly configured: Select a channel port for the second-tier path and 
press  ENTER, then a channel port for the third-tier path and press ENTER, then a 
channel port for a CPU attached to the third-tier Base Unit and press ENTER. If you can 
properly access and operate the chosen CPU, the third-tier Base Unit is properly installed. 
Note: Repeat step K for all remaining third-tier Base Units (if any) attached to this second-tier 
Base Unit. 
L.  Press S to save the configuration. Press F2 to activate the Selection menu and verify that 
the second-tier Base Unit is properly configured: Select a channel port for the second-tier 
path and press ENTER, then a channel port for a CPU attached to the second-tier Base 
Unit and press ENTER. If you can properly access and operate the chosen CPU, the 
second-tier Base Unit is properly installed. 
M.  Repeat steps C through L for all remaining (if any) second-tier Base Units attached to the 
master Base Unit. 
N.  Edit the names of any server CPUs directly attached to the master Base Unit and verify 
the master Base Unit’s configuration as described in steps 6B  through 6E of the section 
Installing a Paragon II with a Single Base Unit, earlier in this chapter. 
Important: If you rearrange a cascaded system or dismantle one and rebuild it 
differently later, you must recycle power to each Base Unit in the new cascade. A soft 
reset allows each Base Unit to retain all user and system profiles, and to auto-detect 
the current status of its channel port and user ports. Follow the installation steps in 
this section to install the new cascade, but when you power on each Base Unit (which 
must be done in proper tier order, from base tier to upper tier), press FUNC on the 
unit’s front panel until “Clear Database Hit Ent/ESC?” appears on the LCD panel. Press 
the ENT and the ESC buttons sequentially to execute a partial reset on the database. 
Please see Chapter 2: Installation, Paragon II Front Panel Display and Controls, “Power 
Up” section for additional information.