4. Verify that the PMF and form are level. Depending on the landscaping requirements, the
top surface of the concrete pad may be 0 to 3 inches (0 to 7.6 cm) above the final grade. The
weld nuts are covered with plugs which must be left in place until the enclosure is mounted. 
Figure 4. Cabinet Concrete Pad Framing
5. Pour the concrete to form the pad but do not pour concrete into the center area of the PMF.
6. Remove the top framing and the temporary support wires when the concrete is ready to be
finished. 
7. Allow concrete to cure before proceeding with the installation. 
5
GROUNDING SYSTEM INSTALLATION
Install a grounding system (not provided) that meets all local electrical codes. Check local codes
for grounding system installation, use of clamps, wire size, and any other grounding
requirements. Typically, #6 AWG copper wire is used for the ground wire. 
If the grounding system includes a ground rod, install the rod (see 
) within the PMF
opening at the indicated point. When installed, the top of the rod should be located 1 to 2 inches
(2.54 to 5.08 cm) below the top of the finished concrete pad. 
Note:  Allow some concrete to flow under the flanges on the bottom of the PMF so the
PMF will be locked in place when the concrete hardens. However, do not allow concrete to
fill the center of the PMF. If necessary, partially fill the center of the PMF with sand or
gravel to prevent an inflow of concrete.
36.8 IN.
(93.5 CM)
38.6 IN.
(97.9 CM)
LEVELING 
STAKES 
(4 PLACES) 
21938-A
TEMPORARY
SUPPORT WIRES
(4 PLACES)
2 x 6 FRAMING 
FOR FORM 
DIMENSIONS SHOW FINISHED 
SIZE OF CONCRETE PAD 
PAD MOUNT 
FRAME (PMF) 
FRONT