3com NETBuilder II 用户手册

下载
页码 22
 
1-6
Installation
 
Installing the HSSI Module
 
CAUTION:
 
 Connections between 3Com equipment and other equipment and peripherals must 
be made using shielded cables in order to maintain compliance with FCC, and other agency 
radio frequency emissions limits. All interconnection cables should be equipped with shielded 
connectors. The backshells of these connectors must completely surround the cable shield.
 
Internal Loopback test
 
An internal loopback test is performed automatically when you insert the HSSI module into the 
NETBuilder II chassis. A successful loopback test is indicated by the following example 
message:
 
3Com Corporation NETBuilder II power-on
IPL1: 1.0.5, REM: 1.0.5
Booting from floppy...
Decompressing...
Booting complete
HSSI Interface: Self Tests passed - slot 1
PHY_CONTROLLER: Self Tests passed - slot 3
MAC CONTROLLER: Self Tests passed - slot 4
FDDI Started. MAC[4] PHY[3]
Wed Dec 31 16:00:06 1969 Path 4 AVAILABLE
Wed Dec 31 16:00:06 1969 Path 1 AVAILABLE
Wed Dec 31 16:00:06 1969 Path 2 AVAILABLE
Wed Dec 31 16:00:06 1969 Path 2 UP
Fri Sep 10 16:50:06 1993 System Initialized and Running
Fri Sep 10 16:50:06 1993 Path 4 UP
Fri Sep 10 16:50:17 1993 Path 1 UP
Fri Sep 10 16:50:35 1993 Port 2 - Forwarding State
Fri Sep 10 16:50:36 1993 Port 4 - Forwarding State
Fri Sep 10 16:50:56 1993 Port 1 - Forwarding State
 
If you receive a different message, refer to Chapter 2, “Troubleshooting and Maintenance,” for 
the appropriate action to take.
 
Hotswap
 
When you hotswap an HSSI module in a running system, the following is displayed:
 
HSSI Interface: Self Tests passed - slot 1
Wed Dec 31 16:00:06 1969 Path 1 AVAILABLE
Fri Sep 10 16:50:17 1993 Path 1 UP